简体版    繁體版    English

Product Categories

Please call to discuss!

Service Hotline:400-630-9858
HongKong Add: 15th Floor, 53-55 Lockhart Road, Wanchai, Hong Kong Commercial Building, 1501 SPA
Tel:00852-31779288
Fax:00852-31779666
Dongguan Add:Qiaotou Town, Dongguan Chang Road 185 bridge
Tel:+86-769-86932806
Fax:+86-769-82824726
Contact:Mr. Hao +86-13926896548
Mailbox:dgokada@163.com
Home:en.okada.com.hk

Dongguan Precision Punch - Precision Punch maintenance


Dongguan Precision Punch - Precision Punch maintenance
A : Every six months of maintenance should be performed using the project
1, test and adjust the projection angle and the test area of the photoelectric safety device performance .
2 , the appearance of the other pieces of electrical systems , and on-line contact wear loose , etc. check .
3 , oil Dongguan Precision Punch overload protection device to clean the oil chamber cleaning , oil renewal movement and functional testing and pressure adjustment
4 , the main motor V -belt wear and tension condition inspection, adjustment ,
5 , from various parts disassemble the brake mechanism ( not including flywheel ) cleaning and maintenance , adjustment and refitted clearance check debugging .
6 , balancer other parts disassemble , clean and inspect refitted
Two : one year maintenance program for each maintenance should be executed
1 , the ball teeth, connecting rod disassemble , cleaning and maintenance, inspection and saw teeth and wear condition rod thread engagement and polishing, grinding and occlusal surfaces greased .
2 , the slider assembly ( high pressure oil chamber , charge cover, overload hydraulic cylinders, worm, worm , etc. ) disassemble , cleaning and maintenance , the gap adjustment and wear surfaces , seal checking and re- applied grease .
? Three: Dongguan Precision Punch maintenance
1 , keep clean and the center column , the slider guide post to keep the ground clean and maintain mold base plate and frame mode when there is no dirt to ensure a clean platform to avoid scratches.
2 , the new use of a punch in the month when the flywheel add some butter ( including feeder ) to maintain its lubrication, no butter if prolonged , can cause wear and tear inside the flywheel affect the performance of the machine , each subsequent maintenance when you also need to add ( heat butter over 150O )
3 , the replacement of the machine cycle oil : the new machine replaced within a month once , and thereafter every six months to replace a time , to ensure the normal operation of the machine in Dongguan Precision punch and precision ( 32 # machine oil or Mobil 1405 # )
? Four: periodic inspection ( recommended daily checks or checks prior to use )
1 , the adequacy of the fuel tank , the oil is clean.
2 , whether the combination of three automatic injector oil . ( Upper and lower inner )
3 , booster pump oil is sufficient. ( More than half of the tank )
4 , with or without oil spills, leakage phenomenon.
5 , if there is drainage storage barrels
6 , any abnormal sound machine .
7 , Dongguan Precision Punch maintain electrical control box inside the clean , airy and smooth .
OKADA Precision Machinery Copyright 2014 [Site Map] [sitemap]
15th Floor, 53-55 Lockhart Road, Wanchai, Hong Kong Commercial Building, 1501 SPA Tel:400-630-9858  Contact:Mr. Hao [Manage]